C/O, or Change Over, refers to the set-up time required to adjust a production line, machine, or process when switching from manufacturing one product to another. Reducing changeover time is a critical factor in Lean Manufacturing and Six Sigma, as it directly impacts productivity, flexibility, and cost efficiency.
Changeover challenges became particularly visible in industries with high product variation. Shigeo Shingo, a key figure in the Toyota Production System, developed the Single-Minute Exchange of Die (SMED) method to minimise downtime. This approach transformed changeovers from hours into minutes, supporting just-in-time production and smaller batch sizes.
Optimising changeover time delivers:
Changeover optimisation is therefore not only a technical improvement but also a strategic enabler of flexible, cost-effective operations.