Business process management (BPM) is a way of working in which you design, run, measure and keep improving your business processes. A process is a series of steps that turns an input, such as an order, into an output, such as a delivered product. BPM makes these processes efficient, visible and repeatable. It is a method, not a piece of software, although software often supports it.
Picture an orchestra conductor. Every musician plays one part, and the conductor makes sure they play in harmony. That is what BPM does for a company. It looks at the whole performance, not at each musician alone.
BPM means reviewing, optimising and continually changing a company’s formal procedures, often with the help of technology and automation. The goal is to make processes efficient, transparent and dependable.
Most organisations have three kinds of processes, and BPM looks at how they work together.
| Type of process | Purpose | Output | Examples |
|---|---|---|---|
| Primary processes | Deliver value to the customer | Product or service | teaching, production, service delivery |
| Supporting processes | Create the conditions to work | Internal services | HR, IT, finance |
| Management processes | Give direction and control | Approach and decisions | planning, reporting, audits |
BPM is a cycle, not a one-off project:
The monitor and optimise steps work well with DMAIC (Define, Measure, Analyze, Improve, Control).
A company processes customer refund requests by email. A request goes through three people and takes 10 working days on average. Nobody can see where requests wait.
With BPM, the team maps the process, adds a simple form so that requests arrive complete, and measures the time per step. They find that requests wait four days for an approval that only one person can give. They allow a second approver for small amounts and add an alert when a request waits more than two days. After the change, the average falls to 5 working days. The team keeps measuring each month.
What often surprises me when improving business processes is that the biggest gain is not always a shorter lead time, fewer errors or lower costs. Sometimes the most important improvement happens while the process is being mapped.
When I map a process with an organisation, I always try to get people from every department involved around the table. That is when the most interesting conversations start. People discover why colleagues carry out tasks in a certain way. What looks like an unnecessary step to one department is sometimes essential for another. And bottlenecks nobody had noticed before become visible.
After such a workshop I sometimes hear: “We mapped the process well, but the most important thing was that we finally had the whole process around the table.” I think that is one of the finest results of process improvement.
A business process runs straight through departments, while people mostly know only their own part. When you look at the whole process together, you gain not only insight into the work but, above all, understanding of each other’s roles, challenges and dependencies.
My experience is that process improvement does not start with changing a process, but with understanding the work and each other.
BPM improves processes step by step and keeps them under control. Business process redesign (BPR), also called reengineering, rethinks a process from scratch to reach a dramatic result in cost, quality, service or speed. Michael Hammer and James Champy made the idea popular in the early 1990s.
In the conductor example, BPM tunes the orchestra. BPR asks whether the orchestra needs a different piece.
BPR focuses on the few core processes that matter most to the customer. It often relies on information technology as an enabler. Because it is a big change, it carries more risk and needs strong support from management.
A business process management system (BPMS) is the software that helps you model, run and monitor processes. Business process outsourcing (BPO) means giving a whole process to an outside company. BPM is the discipline that sits above both.
Customers and markets keep changing. BPM gives you a structured way to keep your processes fast, reliable and focused on what customers value. BPR gives you the tool for the moments when small steps are not enough. Whichever you use, start with what the customer needs. For the day-to-day side, see our article on process management.
Want to learn how to map, measure and improve processes step by step? Try the Lean Six Sigma Green Belt.
BPM is a way of designing, running, measuring and improving business processes so that they are efficient and reliable. It is a method, not a software tool.
BPM improves processes step by step and keeps them under control. BPR (business process redesign) rethinks a process from scratch to reach a big jump in results.
Yes. Lean removes waste in a process, Six Sigma reduces variation, and BPM keeps the process managed and measured after you improve it. DMAIC fits well in the monitor and optimise steps.
Design, model, implement, monitor and optimise. Then you start again, because BPM is a continuing cycle.
No. BPM is the way of working. A BPMS (business process management system) is the software that supports it.
A company maps its refund process, measures the time per step, finds a wait at one approval and adds a second approver. It then keeps measuring each month.